Construction

PT Sorikmas Mining

Construction as the main support for Production Operation activities is still ongoing, with a completion target in the next 2 years.

The main targets of construction to be carried out include:

  1. Construction of a 275 meter long bridge across the Batas Gadis river.
  2. Upgrading of government road access in Malintang Jae – Tanjung Sialang area.
  3. The construction of new road sections is required according to the technical design in the Feasibility Study Revision document.
  4. Construction of mining support infrastructure, in accordance with the Production Operation license owned.